Major Infrastructure Projects

Major Infrastructure Projects

2016 Public Works Projects

  • New Norway Water Tower Refurbishment
  • New Norway Underground Infrastructure Replacement
    • Sewer Main
      • 3rd Ave from Dominion to Main Street
      • New stretch of line down 1st Ave
    • Water Main
      • Dominion Street from 2nd to 3rd Ave
      • New Stretch of line down 1st Ave
  • Road Construction Projects
    • Twp 434 from Hwy 21 to RR 225 - Awarded to Pidherney's
    • Twp 422 from Hwy 56 to RR 184 - Awarded to Petrowest
  • Bridge Replacement Project
    • replace culvert with Concrete Box Culvery at SE13-45-20W4M (on west side of Dried Meat Lake)
  • Pelican Point Drive Paving
  • Armena Highway Entrance Paving
  • Ferintosh Gravel Pit (~45,000 m3) and Dried Meat Lake Gravel Pit (100,000 m3) crushing
  • New Norway Potable Water Truckfill Construction
  • Pavement Line Painting
    • Pelican Point Road
    • Old Hwy 21 by Bashaw
  • Complete backup power supply for Kingman and Ohaton Lift Stations
  • Kingman Roads Surface Fog with MC30-1st, 2nd, 3rd Ave's and Thompson Street
  • Utilities SCADA System Implementation

 

2015 Public Works Projects

  • Armena Drainage Study
  • Meeting Creek Drainage Study
  • Pelican Point Drainage Study
  • Kingman Drainage Study
  • New Norway Grader Shop Construction
    • MD-1348 (AGD-1817) April 14, 2015 Accept the proposal submitted by READ Contracting Ltd. of Camrose County for the Design/Construction of the New Norway Grader/Bus Garage for the sum of $771,200.00 before GST with the funding to come from the 2015 Capital Budget, reserves and the Battle River School Board subject to Battle River School Board approving their portion as well as signing an Encroachment Agreement, signing a Municipal Lease Agreement and the eventual sale of Lots 25-26 Block 2, Plan 2854LZ to Camrose County for $100.00
  • Rge Rd 211 from Secondary Highway 609 to Twp Rd 452 (3-21-14) - Construct in 2015
    • MD-1350 (AGD-1825) April 14, 2015 Tender Awarded to Pidherney's Inc. for total tender price of $1,589,064.36 including site occupancy and excluding GST as based on the tender document ranking guide, with funding to come from the 2015 MSI funding allocated in the Capital Budget
  • Twp Rd 480 from Rge Rd 221 to Highway 21 (3-71-14) - Construct in 2015
    • MD-1351 (AGD-1829) April 14, 2015 Tender Awarded to Pidherney's Inc. for total tender price of $1,631,682.45 including site occupancy and excluding GST as based on the tender document ranking guide, with funding to come from the 2015 MSI funding allocated in the Capital Budget
  • Twp Rd 434 from Rge Rd 184 to Highway 56 (3-11-15) - Design in 2015, Construct in 2016
  • Twp Rd 422 from Rge Rd 223 to Highway 21 (3-12-15) - Design in 2015, Construct in 2016
  • Pelican Point Drive Paving (3-13-15)
  • New Norway Reservoir Completion
  • Bridge File #73474
  • Ferintosh Gravel Crushing
  • Blatz/Gilroy Pit Gravel Crushing